BESS Export Limits: Specify the Response When a Meter Goes Silent

Specify BESS export-limit control with a defined connection meter, PV coordination, data-quality checks and fallback states for meter or communication loss.
Battery Storage Behind a Transformer: Check Headroom in Both Directions

Review transformer headroom for battery charging and discharge using kVA, reactive power, thermal duty, reverse flow and site protection before choosing BESS.
Wrong CT Direction Can Defeat a BESS: A Meter Commissioning Plan

Commission BESS metering with CT polarity, phase mapping, ratios, sign conventions and failure tests before trusting peak-shaving or export-limit controls.