{"id":3651,"date":"2026-11-25T11:51:00","date_gmt":"2026-11-25T11:51:00","guid":{"rendered":"https:\/\/hmxenergy.com\/bess-scada-signal-list\/"},"modified":"2026-11-19T07:40:58","modified_gmt":"2026-11-19T07:40:58","slug":"bess-scada-signal-list","status":"publish","type":"post","link":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/","title":{"rendered":"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart.jpg\" alt=\"Commercial BESS energy flow architecture used to define SCADA measurement and command points\" class=\"wp-image-2942\" srcset=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart.jpg 1536w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart-300x200.jpg 300w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart-1024x683.jpg 1024w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart-768x512.jpg 768w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart-18x12.jpg 18w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart-800x533.jpg 800w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" \/><figcaption class=\"wp-element-caption\">A useful SCADA point list follows operating decisions and equipment boundaries, not a generic tag export.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A BESS can expose tens of thousands of internal values and still give the control room too little information to operate safely. A raw register map does not define which signal is authoritative, what units and quality apply, who owns a command, how stale data are handled or which event must be time stamped at the source.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The buyer needs a SCADA signal schedule that connects operational use cases to points, protocol objects, command interlocks, historian rules and acceptance tests. This guide covers the minimum structure for utility-scale and commercial systems without prescribing one protocol or one market&#8217;s telemetry rules.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Start with Decisions, Not Tag Names<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">List the actions the operator, dispatcher, maintenance team and emergency responder must take. Examples include start, stop, charge, discharge, reactive-power control, availability declaration, alarm response, isolation, grid reconnection and safe shutdown. For each action, identify the measurements, states, limits, permissives, alarms and acknowledgements required to make and verify the decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separate operational points from engineering diagnostics. The control room needs a stable, qualified set of plant and block signals. Maintenance may need cell extrema, coolant details, fan states, insulation values and controller diagnostics. A clear layer prevents operators from searching through thousands of device tags and prevents external masters from receiving unnecessary sensitive data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Define the point of measurement and aggregation. \u201cSOC\u201d can mean a rack value, a capacity-weighted block estimate, a plant controller value or an energy-management calculation. \u201cAvailable power\u201d can mean current PCS headroom or a sustainable value considering SOC, temperature, warranty and site limits. Every derived signal needs a formula owner, input quality rule, update rate and fallback.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Signal class<\/th><th>Exemples<\/th><th>D\u00e9finition requise<\/th><\/tr><\/thead><tbody><tr><td>Measurements<\/td><td>MW, Mvar, voltage, frequency, SOC, temperature<\/td><td>Source, units, sign, range, scaling and quality<\/td><\/tr><tr><td>Status<\/td><td>Breaker, contactor, local\/remote, mode, availability<\/td><td>State encoding, invalid combination and debounce<\/td><\/tr><tr><td>Alarms<\/td><td>Trip, fire, insulation, cooling, communication<\/td><td>Priority, latch, delay, acknowledgement and clearance<\/td><\/tr><tr><td>Commands<\/td><td>Start, stop, reset, mode and breaker control<\/td><td>Authority, interlock, select\/execute and timeout<\/td><\/tr><tr><td>Setpoints<\/td><td>P, Q, PF, voltage, SOC reserve and ramp<\/td><td>Limits, rate, rejection and achieved-value feedback<\/td><\/tr><tr><td>Calculated capability<\/td><td>Available charge\/discharge power and energy<\/td><td>Algorithm, horizon, quality and refresh<\/td><\/tr><tr><td>Events<\/td><td>Protection pickup, trip, state change and command result<\/td><td>Source timestamp, resolution and sequence<\/td><\/tr><tr><td>Diagnostics<\/td><td>Controller health, firmware, clock and network<\/td><td>Audience, access and maintenance action<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Table 1. Build the point list around signal classes and explicit meanings.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Use a Data Dictionary That Engineers and Integrators Can Test<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Each row should contain a stable tag identifier, plain-English description, equipment scope, source device, source register or logical node, destination, data type, engineering units, scale, precision, normal range and sign convention. Add scan class, event class, deadband, timestamp source, quality behavior, alarm priority, historian rule and cybersecurity role.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use positive and negative power conventions consistently. State whether charging is positive or negative at the PCS, meter and plant controller, and translate only at controlled interfaces. Define three-phase versus per-phase values, line-to-line versus line-to-neutral voltage, power-factor sign and leading\/lagging convention. Ambiguity here can reverse a dispatch command or falsify a performance calculation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Identify the authoritative meter for each commercial and control function. The <a href=\"https:\/\/hmxenergy.com\/fr\/mise-en-service-du-compteur-ct-du-bess\/\">guide de mise en service du compteur et des TC de la BESS<\/a> explains how ratio, polarity, phase and time alignment affect data. SCADA should not silently substitute a PCS estimate for a revenue or compliance meter when the primary source is unavailable; report bad quality and use a documented fallback if one is approved.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Map the Information Model before Choosing Addresses<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A protocol address is an implementation detail. First define the semantic object: what it represents, how it behaves and which quality and time attributes accompany it. Then map that object to DNP3, IEC 61850, IEC 60870-5-104, Modbus TCP, OPC UA or another approved interface. This prevents the point definition from being trapped in one vendor&#8217;s register order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The IEC&#8217;s technical overview of <a href=\"https:\/\/iec61850.dvl.iec.ch\/what-is-61850\/technical-principles\/comm_concepts\/\" target=\"_blank\" rel=\"noopener noreferrer\">IEC 61850 communication concepts<\/a> notes the information model for distributed energy resources and protocol mappings. Use the applicable edition and utility profile; citing IEC 61850 alone does not specify logical nodes, data objects, services, reports, datasets, redundancy or engineering files.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/68270\" target=\"_blank\" rel=\"noopener noreferrer\">IEC TS 63266:2023<\/a> addresses reference processes and logical data-flow structures for IEC 61850 substation systems. Where relevant, use the process approach to keep protection, control, supervision and maintenance flows traceable. The project still needs a site-specific signal schedule and configuration files.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system.jpg\" alt=\"Energy storage controller illustrating the source device behind SCADA points\" class=\"wp-image-2503\" srcset=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system.jpg 1000w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-300x300.jpg 300w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-150x150.jpg 150w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-768x768.jpg 768w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-12x12.jpg 12w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-600x600.jpg 600w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-800x800.jpg 800w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Built\u2011in-MPPT-controller-of-12kW-30kWh-all\u2011in\u2011one-energy-storage-system-100x100.jpg 100w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><figcaption class=\"wp-element-caption\">Every published point should remain traceable to its source device, calculation and firmware version.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Treat Quality and Time as Part of the Value<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A displayed number without quality can be dangerous. Define invalid, stale, substituted, out-of-range, communication-lost, restarted and manually overridden states. Determine whether downstream calculations propagate bad quality, freeze the last good value or switch to another source. The HMI must make the state visible; a frozen green value is not a communication-loss alarm.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Set update rates and deadbands by function. Dispatch control, frequency response, protection event analysis, thermal monitoring and monthly reporting have different needs. Excessively fast polling can overload controllers and networks, while wide deadbands can hide oscillation or a limit crossing. State whether the deadband is absolute, percentage, integrated or device-specific.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Time stamp fast events at the source whenever the protocol and device support it. Record clock source, accuracy, time zone, daylight-saving behavior, synchronization loss and holdover. Distinguish device event time from gateway receipt time and historian insertion time. Sequence-of-events analysis fails when those fields are mixed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The DNP Users Group lists <a href=\"https:\/\/www.dnp.org\/About\/Features-of-DNP3\" target=\"_blank\" rel=\"noopener noreferrer\">time-stamped events and class-based reporting among DNP3 features<\/a>. A DNP3 selection does not automatically configure them correctly. Define object variations, event classes, unsolicited behavior, confirmation, time sync, restart handling and buffer-overflow alarms in the project profile.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Design Commands for Authority, Feedback and Failure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Identify every command source: local HMI, site SCADA, EMS, utility master, aggregator, maintenance tool and emergency panel. Establish a control-authority state machine with visible ownership and permitted transfer conditions. A source should not overwrite another silently. Define priority for safety trips, protection, emergency stop, manual local control, network dispatch and optimization.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For each control, specify select-before-operate if required, interlocks, valid modes, range, ramp, timeout, command identifier and rejection reason. Provide separate feedback for command receipt, command acceptance and achieved state. A setpoint echo only shows that a value was stored; it does not prove that the plant delivered it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Map command failure into operator action. Loss of the master link, stale setpoint, partial block response, limit enforcement and plant-controller failover should each produce a defined alarm and fallback. Coordinate actions with the <a href=\"https:\/\/hmxenergy.com\/fr\/coordination-des-protections-du-bess\/\">BESS protection coordination design<\/a>; SCADA should not delay or override protection, and a protection trip should report the first cause and the devices operated.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Command case<\/th><th>Required behavior<\/th><th>Operator evidence<\/th><\/tr><\/thead><tbody><tr><td>Valid remote command<\/td><td>Pass interlocks, acknowledge and execute<\/td><td>Receipt, acceptance and achieved state<\/td><\/tr><tr><td>Out-of-range setpoint<\/td><td>Reject or clamp only by agreed rule<\/td><td>Reason and effective setpoint<\/td><\/tr><tr><td>Wrong control authority<\/td><td>Reject without changing state<\/td><td>Current owner and transfer requirement<\/td><\/tr><tr><td>Perte de communication<\/td><td>Enter defined local fallback<\/td><td>Alarm, last valid command and timer<\/td><\/tr><tr><td>Partial plant availability<\/td><td>Respect available capability<\/td><td>Delivered value and limiting cause<\/td><\/tr><tr><td>Protection operation<\/td><td>Override operational command safely<\/td><td>First-out trip and breaker\/PCS state<\/td><\/tr><tr><td>Controller restart\/failover<\/td><td>Prevent unintended command replay<\/td><td>Restart event, mode and restored values<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Table 2. Every command needs a tested failure response and explicit feedback.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Prioritize Alarms Instead of Exporting Every Bit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Create an alarm philosophy with safety, trip, urgent operational, maintenance and advisory classes. Define presentation order, color, audible behavior, acknowledgement, shelving, suppression, latching and clearance. Alarm floods often occur when one root fault triggers device, gateway, block and plant summaries; design parent-child suppression while retaining the original event record.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Publish useful first-out information for PCS trips, BMS trips, fire alarms, insulation alarms, cooling failures and protection operations. Keep the original device code available to maintenance, but give the operator a stable summary and required action. Connect safety signals to the <a href=\"https:\/\/hmxenergy.com\/fr\/dossier-dinformation-sur-la-reponse-aux-urgences-des-bess\/\">BESS emergency response information pack<\/a> so responders know which indications are reliable during an event and which systems may have lost power or communications.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Build Security into the Point and Command Design<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Define Availability and Capability as Auditable Signals<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Available charge and discharge power are operational promises, not raw equipment ratings. Define the calculation horizon and limiting inputs: online PCS capacity, battery current, SOC reserve, temperature, cell voltage, auxiliary state, transformer or connection limit, reactive-power obligation and any maintenance restriction. Provide both the available value and a coded limiting reason so dispatchers can distinguish a temporary thermal limit from an unavailable block.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Available energy needs the same discipline. State whether it is AC or DC energy, the reference meter, assumed discharge or charge power, efficiency treatment, minimum\/maximum operating SOC and whether forecast temperature or ageing is included. Do not label a nameplate-capacity value as real-time available energy. If the algorithm cannot produce a valid result, publish bad quality rather than a plausible default.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use explicit plant, block and unit availability states. A binary available flag cannot explain derated, starting, stopping, isolated, faulted, maintenance, communication-lost or test modes. Define allowed state transitions and calculate plant availability from unit states by an approved rule. The HMI should show which capacity is excluded and why.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Specify Historian and Evidence Retention<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Decide which values are retained as periodic trends, change-of-state events, high-speed disturbance records and immutable security logs. Set sample interval, deadband, compression, retention, export format and time basis for each class. Monthly averages cannot reconstruct a fast trip, while millisecond data for every temperature point create cost without operational value.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Preserve context with an event: operating mode, setpoints, capability limits, SOC, protection targets, controller versions and time-quality status. Define a trigger and pre\/post-event window for high-resolution capture. Verify buffer capacity and behavior when the central historian is unavailable; local storage should report overflow or data loss rather than overwrite silently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ownership and access need contract language. The asset owner should be able to export operational and event data in documented formats without depending on a vendor portal. Protect personal, security-sensitive and proprietary information through role and retention controls. Define what the OEM may collect remotely, where it is stored, how long it is retained and how access is revoked at contract end.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Plan Regression Testing for Every Interface Change<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A new controller firmware, gateway, protocol library, point-map revision or utility master can alter scaling, time, quality and command behavior. Classify changes by risk and maintain a regression set covering critical measurements, alarms, controls, failover and security. Compare machine-readable point-list versions to detect deleted, duplicated or reassigned addresses before deployment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use a staging environment where practical, but confirm the final site route after installation. Back up configurations and prove rollback before a live change. Record who approved the update, the files and hashes installed, tests run, exceptions and the effective time. Operators should receive a concise impact note before the modified interface returns to service.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Classify read, control, engineering and administrative access. Restrict critical commands and configuration by role, authenticate sessions where supported, protect credentials and log user, source, time, command and result. Network encryption alone does not define command authorization. Include certificate or key lifecycle, device replacement and loss-of-time behavior in the operating plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The DNP Users Group&#8217;s description of <a href=\"https:\/\/www.dnp.org\/Portals\/0\/Public%20Documents\/SAv6%20and%20AMP%20flyer%20-%202022%20-%20Final.pdf?ver=z_i7KIkCzZDyYSWJPhU3KA%3D%3D\" target=\"_blank\" rel=\"noopener noreferrer\">DNP3 Secure Authentication version 6<\/a> covers authentication, integrity and encryption capabilities. If DNP3 is selected, specify the required security profile and interoperability test; \u201csupports secure DNP3\u201d is not enough to define enabled functions, certificate handling or fallback.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Test from Source Device to Control-Room Screen<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At FAT, force or simulate each representative value and state at the source, then verify mapping, scaling, quality, time, alarm and historian behavior at every gateway and master. Use the <a href=\"https:\/\/hmxenergy.com\/fr\/protocole-de-test-de-graisse-bess\/\">Protocole FAT du BESS<\/a> to control versions and exceptions. Test boundaries, negative values, invalid states, restart, buffer fill, communication interruption and failover\u2014not only nominal values.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At site, repeat tests affected by wiring, network, CT\/VT circuits, utility master, time source and cybersecurity infrastructure. Verify end-to-end commands with equipment in a safe test state. A command test should prove interlock, rejection, execution, feedback, timeout and audit trail. Coordinate transformer and breaker points with the <a href=\"https:\/\/hmxenergy.com\/fr\/mise-sous-tension-du-transformateur-bess\/\">BESS transformer energization plan<\/a> before the first live switching operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le projet 2025 de la NERC <a href=\"https:\/\/www.nerc.com\/globalassets\/who-we-are\/standing-committees\/rstc\/irps\/draft_rg_ibr_commissioning_best_practices_irps_draft_12aug2025_clean-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">draft IBR commissioning guideline<\/a> includes monitoring and logging examples such as real-time SOC and operating limits. Because it remains a draft, use it as current technical context rather than a binding rule, and defer to the applicable operator and connection requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1282\" height=\"572\" src=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi.jpg\" alt=\"BESS site commissioning where SCADA points and commands are tested end to end\" class=\"wp-image-3235\" srcset=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi.jpg 1282w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi-300x134.jpg 300w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi-1024x457.jpg 1024w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi-768x343.jpg 768w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi-18x8.jpg 18w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/commercial-solar-storage-project-installation-container-energy-storage-system-wi-800x357.jpg 800w\" sizes=\"(max-width: 1282px) 100vw, 1282px\" \/><figcaption class=\"wp-element-caption\">Site acceptance must prove the complete route from device measurement or command to the intended control-room result.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Deliver a Controlled SCADA Package<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The handover package should include the approved data dictionary, protocol profile, device addressing, IEC 61850 files where applicable, DNP3 profile, gateway configurations, historian rules, HMI\/alarm philosophy, command authority matrix, cybersecurity configuration, test scripts, results, firmware and backups. Provide editable and machine-readable files, not only a PDF printout.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Porte de validation<\/th><th>Required artifact<\/th><th>Acceptance check<\/th><\/tr><\/thead><tbody><tr><td>Use-case freeze<\/td><td>Operator, dispatcher, maintenance and emergency decisions<\/td><td>Each decision has required information<\/td><\/tr><tr><td>Point-list freeze<\/td><td>Dictionary with source, meaning, quality and time<\/td><td>No undefined or duplicate authoritative point<\/td><\/tr><tr><td>Protocol design<\/td><td>Object\/address mapping and security profile<\/td><td>Both endpoints approve<\/td><\/tr><tr><td>Command review<\/td><td>Authority, interlocks, limits and feedback<\/td><td>Safe failure behavior documented<\/td><\/tr><tr><td>FAT<\/td><td>Mapping, alarm, historian, restart and command results<\/td><td>Exceptions closed or controlled<\/td><\/tr><tr><td>SAT<\/td><td>End-to-end utility\/owner system tests<\/td><td>As-built network and time source proven<\/td><\/tr><tr><td>Transfert<\/td><td>Backups, files, manuals and training<\/td><td>Owner can restore and maintain<\/td><\/tr><tr><td>Ma\u00eetrise des modifications<\/td><td>Impact review for point\/firmware\/protocol changes<\/td><td>Regression tests defined<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Table 3. A SCADA point list becomes reliable through controlled design and end-to-end evidence.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A strong SCADA schedule does not maximize point count. It gives each required decision an authoritative, qualified and timely value; gives each command an owner and verifiable result; and leaves a maintainable interface that can survive controller replacement, firmware updates and new market requirements.<\/p>","protected":false},"excerpt":{"rendered":"<p>A technical buyer guide to BESS SCADA measurements, alarms, commands, quality, time stamps, protocol mappings and end-to-end acceptance tests.<\/p>","protected":false},"author":4,"featured_media":2942,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3651","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"HMX ENERGY\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"fr_FR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"HMX Energy Co., Ltd -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"BESS SCADA Signal List: Points, Commands and Quality\" \/>\n\t\t<meta property=\"og:description\" content=\"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t\t<meta property=\"og:image:height\" content=\"495\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-25T11:51:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-19T07:40:58+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Huiming-green-ennergy\/100091938723333\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"BESS SCADA Signal List: Points, Commands and Quality\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#blogposting\",\"name\":\"BESS SCADA Signal List: Points, Commands and Quality\",\"headline\":\"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership\",\"author\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/author\\\/hmxenergy\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"C&I ESS system working principle diagram PV PCS battery load energy flow chart\"},\"datePublished\":\"2026-11-25T11:51:00+00:00\",\"dateModified\":\"2026-11-19T07:40:58+00:00\",\"inLanguage\":\"fr-FR\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#webpage\"},\"articleSection\":\"Blog&amp;News\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog&amp;News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/category\\\/blog\\\/#listItem\",\"position\":2,\"name\":\"Blog&amp;News\",\"item\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/category\\\/blog\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#listItem\",\"name\":\"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#listItem\",\"position\":3,\"name\":\"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog&amp;News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#organization\",\"name\":\"HMX Energy Co., Ltd\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/\",\"telephone\":\"+8613310869219\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/HM-logo.png\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#organizationLogo\",\"width\":740,\"height\":495,\"caption\":\"HM logo\"},\"image\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Huiming-green-ennergy\\\/100091938723333\\\/\",\"https:\\\/\\\/www.instagram.com\\\/hmxenergy?igsh=MWZkY293OG90c3J3MQ&utm_source=qr\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/shenzhen-hmx-new-energy-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/author\\\/hmxenergy\\\/#author\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/author\\\/hmxenergy\\\/\",\"name\":\"HMX ENERGY\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#webpage\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/\",\"name\":\"BESS SCADA Signal List: Points, Commands and Quality\",\"description\":\"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\\\/SAT evidence.\",\"inLanguage\":\"fr-FR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/author\\\/hmxenergy\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/author\\\/hmxenergy\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart.jpg\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#mainImage\",\"width\":1536,\"height\":1024,\"caption\":\"C&I ESS system working principle diagram PV PCS battery load energy flow chart\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/bess-scada-signal-list\\\/#mainImage\"},\"datePublished\":\"2026-11-25T11:51:00+00:00\",\"dateModified\":\"2026-11-19T07:40:58+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/\",\"name\":\"HMX Energy Co., Ltd\",\"inLanguage\":\"fr-FR\",\"publisher\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/fr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"BESS SCADA Signal List: Points, Commands and Quality","description":"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.","canonical_url":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#blogposting","name":"BESS SCADA Signal List: Points, Commands and Quality","headline":"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership","author":{"@id":"https:\/\/hmxenergy.com\/fr\/author\/hmxenergy\/#author"},"publisher":{"@id":"https:\/\/hmxenergy.com\/fr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart.jpg","width":1536,"height":1024,"caption":"C&I ESS system working principle diagram PV PCS battery load energy flow chart"},"datePublished":"2026-11-25T11:51:00+00:00","dateModified":"2026-11-19T07:40:58+00:00","inLanguage":"fr-FR","mainEntityOfPage":{"@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#webpage"},"isPartOf":{"@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#webpage"},"articleSection":"Blog&amp;News"},{"@type":"BreadcrumbList","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/#listItem","position":1,"name":"Home","item":"https:\/\/hmxenergy.com\/fr\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/category\/blog\/#listItem","name":"Blog&amp;News"}},{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/category\/blog\/#listItem","position":2,"name":"Blog&amp;News","item":"https:\/\/hmxenergy.com\/fr\/category\/blog\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#listItem","name":"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#listItem","position":3,"name":"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership","previousItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/fr\/category\/blog\/#listItem","name":"Blog&amp;News"}}]},{"@type":"Organization","@id":"https:\/\/hmxenergy.com\/fr\/#organization","name":"HMX Energy Co., Ltd","url":"https:\/\/hmxenergy.com\/fr\/","telephone":"+8613310869219","logo":{"@type":"ImageObject","url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#organizationLogo","width":740,"height":495,"caption":"HM logo"},"image":{"@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Huiming-green-ennergy\/100091938723333\/","https:\/\/www.instagram.com\/hmxenergy?igsh=MWZkY293OG90c3J3MQ&utm_source=qr","https:\/\/www.linkedin.com\/company\/shenzhen-hmx-new-energy-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/hmxenergy.com\/fr\/author\/hmxenergy\/#author","url":"https:\/\/hmxenergy.com\/fr\/author\/hmxenergy\/","name":"HMX ENERGY"},{"@type":"WebPage","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#webpage","url":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/","name":"BESS SCADA Signal List: Points, Commands and Quality","description":"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.","inLanguage":"fr-FR","isPartOf":{"@id":"https:\/\/hmxenergy.com\/fr\/#website"},"breadcrumb":{"@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#breadcrumblist"},"author":{"@id":"https:\/\/hmxenergy.com\/fr\/author\/hmxenergy\/#author"},"creator":{"@id":"https:\/\/hmxenergy.com\/fr\/author\/hmxenergy\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/CI-ESS-system-working-principle-diagram-PV-PCS-battery-load-energy-flow-chart.jpg","@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#mainImage","width":1536,"height":1024,"caption":"C&I ESS system working principle diagram PV PCS battery load energy flow chart"},"primaryImageOfPage":{"@id":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/#mainImage"},"datePublished":"2026-11-25T11:51:00+00:00","dateModified":"2026-11-19T07:40:58+00:00"},{"@type":"WebSite","@id":"https:\/\/hmxenergy.com\/fr\/#website","url":"https:\/\/hmxenergy.com\/fr\/","name":"HMX Energy Co., Ltd","inLanguage":"fr-FR","publisher":{"@id":"https:\/\/hmxenergy.com\/fr\/#organization"}}]},"og:locale":"fr_FR","og:site_name":"HMX Energy Co., Ltd -","og:type":"article","og:title":"BESS SCADA Signal List: Points, Commands and Quality","og:description":"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.","og:url":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/","og:image":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png","og:image:secure_url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png","og:image:width":740,"og:image:height":495,"article:published_time":"2026-11-25T11:51:00+00:00","article:modified_time":"2026-11-19T07:40:58+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Huiming-green-ennergy\/100091938723333\/","twitter:card":"summary_large_image","twitter:title":"BESS SCADA Signal List: Points, Commands and Quality","twitter:description":"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.","twitter:image":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png"},"aioseo_meta_data":{"post_id":"3651","title":"BESS SCADA Signal List: Points, Commands and Quality","description":"Build a testable BESS SCADA signal list with source definitions, units, quality, timestamps, alarms, control authority, protocol mapping and FAT\/SAT evidence.","keywords":null,"keyphrases":{"focus":{"keyphrase":"BESS SCADA signal list","score":0,"analysis":[]},"additional":[]},"focus_keyword":"BESS SCADA signal list","additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":0,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-11-19 07:40:55","updated":"2026-11-25 11:54:29"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hmxenergy.com\/fr\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hmxenergy.com\/fr\/category\/blog\/\" title=\"Blog&amp;News\">Blog&amp;News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBESS SCADA Signal List: Define Points, Quality, Commands and Ownership\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hmxenergy.com\/fr\/"},{"label":"Blog&amp;News","link":"https:\/\/hmxenergy.com\/fr\/category\/blog\/"},{"label":"BESS SCADA Signal List: Define Points, Quality, Commands and Ownership","link":"https:\/\/hmxenergy.com\/fr\/bess-scada-signal-list\/"}],"_links":{"self":[{"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/posts\/3651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/comments?post=3651"}],"version-history":[{"count":1,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/posts\/3651\/revisions"}],"predecessor-version":[{"id":3652,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/posts\/3651\/revisions\/3652"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/media\/2942"}],"wp:attachment":[{"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/media?parent=3651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/categories?post=3651"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hmxenergy.com\/fr\/wp-json\/wp\/v2\/tags?post=3651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}