{"id":3315,"date":"2026-10-06T10:44:00","date_gmt":"2026-10-06T10:44:00","guid":{"rendered":"https:\/\/hmxenergy.com\/?p=3315"},"modified":"2026-10-04T00:50:20","modified_gmt":"2026-10-04T00:50:20","slug":"ev-charging-demand-charges-bess","status":"publish","type":"post","link":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/","title":{"rendered":"Taxas de Demanda de Carregamento de VE: Modele Primeiro o Pico Coincidente"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1.jpg\" alt=\"BESS demand charge management EV charging: 120kW Dual - Gun Charging Pile Project 1\" class=\"wp-image-1084\" srcset=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1.jpg 1000w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1-600x600.jpg 600w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1-100x100.jpg 100w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1-800x800.jpg 800w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1-300x300.jpg 300w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1-150x150.jpg 150w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1-768x768.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Fast charging can create short, high site peaks. Where a tariff bills monthly demand, a battery may cap grid import during those events. The value depends on the exact billing rule and the operator\u2019s ability to recharge without creating a second peak.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A global battery-cost benchmark cannot replace a local cash-flow model. Charger use, tariff structure, grid upgrade cost and service obligations must be entered separately.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para uma revis\u00e3o concreta em n\u00edvel de equipamento, aplique as verifica\u00e7\u00f5es acima \u00e0 <a href=\"https:\/\/hmxenergy.com\/pt\/produto\/estacao-de-recarga-integrada-com-armazenamento-de-energia\/\">Solu\u00e7\u00e3o de carregamento integrada com armazenamento de 100\/200kWh<\/a> e solicite confirma\u00e7\u00e3o para as condi\u00e7\u00f5es do local e modo de opera\u00e7\u00e3o pretendidos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The general calculation sequence is set out in the <a href=\"https:\/\/hmxenergy.com\/pt\/dimensionamento-de-bateria-para-corte-de-picos\/\">guia de dimensionamento de bateria para redu\u00e7\u00e3o de picos<\/a>. For charging sites, replace the factory load series with session-level charger demand and retain the same tariff-interval discipline.<\/p>\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p><strong>Resposta direta:<\/strong> Reproduce the utility bill from interval data before modelling storage. If the base model cannot match billed demand, the savings forecast is not ready for investment approval.<\/p><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Data de revis\u00e3o da investiga\u00e7\u00e3o: 4 de outubro de 2026. As afirma\u00e7\u00f5es quantitativas est\u00e3o vinculadas \u00e0 fonte associada e devem ser reverificadas se a aquisi\u00e7\u00e3o ocorrer mais tarde.<\/p>\n\n\n<p class=\"wp-block-paragraph\">O <a href=\"https:\/\/afdc.energy.gov\/fuels\/electricity-infrastructure-maintenance-and-operation\" target=\"_blank\" rel=\"noopener noreferrer\">Alternative Fuels Data Center guidance on charging-station operating costs<\/a> notes that DC fast charging is more likely than lower-power charging to trigger demand charges and describes demand as commonly based on the highest 15-minute average in the billing period. The project model should therefore reproduce the local tariff interval instead of smoothing sessions into hourly data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Antes do congelamento do design, a equipe do projeto deve revisar <a href=\"https:\/\/www.energy.gov\/cmei\/femp\/evaluating-your-utility-rate-options\" target=\"_blank\" rel=\"noopener noreferrer\">Orienta\u00e7\u00e3o da DOE sobre tarifas de servi\u00e7os p\u00fablicos<\/a>. As faturas de servi\u00e7os p\u00fablicos podem combinar componentes de energia, pot\u00eancia e tarifas hor\u00e1rias, pelo que os modelos de poupan\u00e7a devem utilizar a tarifa real em vez de uma diferencia\u00e7\u00e3o gen\u00e9rica entre horas de ponta e fora de ponta.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Reproduce the tariff demand interval<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For Commercial charging operators and site owners, the first task is to turn the intended service into measurable inputs and acceptance limits. The following table keeps the decision tied to evidence instead of a broad product label.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Model layer<\/th><th>Required data<\/th><th>Output<\/th><\/tr><\/thead><tbody><tr><td>Charging demand<\/td><td>Sessions, dwell time and power curve<\/td><td>Uncontrolled site load<\/td><\/tr><tr><td>Non-charging load<\/td><td>Building and auxiliary interval load<\/td><td>Total site demand<\/td><\/tr><tr><td>Tarifa<\/td><td>Demand interval, ratchet and time periods<\/td><td>Baseline bill<\/td><\/tr><tr><td>Battery dispatch<\/td><td>Power, energy, reserve and recharge rule<\/td><td>Controlled grid load<\/td><\/tr><tr><td>Degradation and service<\/td><td>Cycles, throughput and maintenance<\/td><td>Lifecycle cost<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Demand-charge model<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power-1024x683.jpg\" alt=\"BESS demand charge management EV charging: energy storage system for commercial building and shopping mall peak shaving backup power\" class=\"wp-image-2974\" srcset=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power-1024x683.jpg 1024w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power-300x200.jpg 300w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power-768x512.jpg 768w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power-18x12.jpg 18w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power-800x533.jpg 800w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/energy-storage-system-for-commercial-building-and-shopping-mall-peak-shaving-backup-power.jpg 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As mesmas evid\u00eancias e quest\u00f5es de aceita\u00e7\u00e3o podem ser usadas ao avaliar o <a href=\"https:\/\/hmxenergy.com\/pt\/categoria-produto\/estacoes-de-carregamento-de-veiculos-eletricos\/\">solu\u00e7\u00f5es de carregamento com armazenamento de energia<\/a>; as informa\u00e7\u00f5es do cat\u00e1logo devem ser reconciliadas com a cota\u00e7\u00e3o controlada e os desenhos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para a revis\u00e3o final de evid\u00eancias, utilizar <a href=\"https:\/\/www.iea.org\/reports\/global-ev-outlook-2026\/electric-vehicle-charging-chap-6-and-10\" target=\"_blank\" rel=\"noopener noreferrer\">An\u00e1lise de carregamento do Global EV Outlook 2026 da AIE<\/a> as a source check. IEA estimates more than 7 million public charging points at the end of 2025, after growth of more than 33% in one year; fast and ultra-fast points reached 2.2 million.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Replay charger sessions against the grid cap<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A oferta comercial deve declarar suas premissas, exclus\u00f5es e limite de medi\u00e7\u00e3o. Os compradores podem ent\u00e3o comparar sistemas na mesma base e manter altera\u00e7\u00f5es posteriores de design sob controle de documentos.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Scenario<\/th><th>Pergunta<\/th><th>Sensitivity<\/th><\/tr><\/thead><tbody><tr><td>Low utilisation<\/td><td>Are peaks rare but expensive?<\/td><td>Demand savings versus fixed cost<\/td><\/tr><tr><td>Growth case<\/td><td>How fast do sessions increase?<\/td><td>Expansion and grid limit<\/td><\/tr><tr><td>Back-to-back sessions<\/td><td>Can storage recover between peaks?<\/td><td>Recharge power<\/td><\/tr><tr><td>High tariff spread<\/td><td>Can recharge move off-peak?<\/td><td>Energy cost<\/td><\/tr><tr><td>Backup reserve<\/td><td>Must energy remain unused for outages?<\/td><td>Available shaving capacity<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Investment sensitivities<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Pontos de a\u00e7\u00e3o para a equipa do projeto<\/h3>\n\n\n\n<ul class=\"wp-block-list\"><li>Run at least a base, growth and stress scenario.<\/li><li>Include months with special events or seasonal fleet peaks.<\/li><li>Do not count the same battery capacity fully for charging support, demand shaving and backup at the same time.<\/li><li>Use contractual availability and response requirements in the financial model.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Para contexto atual de mercado e pol\u00edticas, revise <a href=\"https:\/\/www.iea.org\/reports\/electricity-2026\/flexibility\" target=\"_blank\" rel=\"noopener noreferrer\">an\u00e1lise de flexibilidade da IEA Electricity 2026<\/a>. A IEA identifica as baterias como uma fonte vers\u00e1til de flexibilidade de curto prazo para o sistema el\u00e9trico, mas a dura\u00e7\u00e3o necess\u00e1ria depende do servi\u00e7o a ser prestado.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Where demand-charge models overstate savings<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">These are the practical objections and failure modes most likely to stop approval, delay commissioning or create an avoidable service call for Commercial charging operators and site owners.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>The baseline model cannot reproduce the billed demand.<\/li><li>A recharge event creates another peak in the same billing period.<\/li><li>Session growth is included in revenue but not in grid or battery stress.<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Perguntas que o comprador deve fazer antes da aprova\u00e7\u00e3o<\/h3>\n\n\n\n<ul class=\"wp-block-list\"><li>Which exact interval, ratchet and seasonal rules apply?<\/li><li>How does a back-to-back fast-charging day change the result?<\/li><li>What capacity remains unavailable because of backup reserve?<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Make the financial model reproduce operations and billing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Validate the tariff engine against actual invoices, including interval length, time periods, ratchets, minimums and seasonal rules. Combine charger sessions with the rest of the site load. The baseline should reproduce both monthly kWh and billed kW within an explained tolerance before storage dispatch is introduced.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Uma refer\u00eancia HMX relacionada \u00e9 a <a href=\"https:\/\/hmxenergy.com\/pt\/categoria-produto\/armazenamento-de-energia-comercial-e-industrial\/\">faixa de armazenamento de energia comercial e industrial<\/a>. Utilize-a para enquadrar a pr\u00f3xima discuss\u00e3o com fornecedores e, em seguida, registe os desvios espec\u00edficos do projeto antes de encomendar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Simulate the battery with power, usable energy, reserve, efficiency, auxiliaries and recharge constraints. Review the state of charge after every high-demand event. Back-to-back sessions can exhaust the buffer, while aggressive recharge can set a new peak. The model should count target breaches rather than assuming every event is shaved successfully.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A compara\u00e7\u00e3o t\u00e9cnica tamb\u00e9m deve ser verificada em rela\u00e7\u00e3o \u00e0 <a href=\"https:\/\/www.irena.org\/Digital-Report\/Renewable-Power-Generation-Costs-in-2024\" target=\"_blank\" rel=\"noopener noreferrer\">IRENA Renewable Power Generation Costs in 2024<\/a>. A IRENA reporta um custo instalado m\u00e9dio global de USD 192\/kWh em 2024 para armazenamento em baterias de escala utilit\u00e1ria, 93% abaixo de 2010. Os compradores n\u00e3o devem tratar esse benchmark global como uma cota\u00e7\u00e3o de projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Present cash flow as scenarios, not one guaranteed saving. Include utilisation growth, tariff change, degradation, service, downtime and alternative grid work. If backup reserve is required, remove it from the economic dispatch window. The decision should compare the value of faster site deployment and managed grid demand with the full lifecycle obligation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Fluxo de trabalho do projeto<\/h3>\n\n\n\n<ul class=\"wp-block-list\"><li>Reproduce historic bills from interval load and tariff rules.<\/li><li>Simulate sessions, recharge and reserve across complete months.<\/li><li>Run utilisation, tariff, degradation and availability sensitivities.<\/li><li>Tie investment approval to auditable assumptions and operating KPIs.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Mantenha o c\u00e1lculo reproduz\u00edvel<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Salve o arquivo bruto do medidor ou de carga, o log de limpeza, as regras tarif\u00e1rias ou operacionais, a vers\u00e3o do modelo e todas as premissas que convertem dados do site em pot\u00eancia e energia. O propriet\u00e1rio deve ser capaz de reexecutar o caso base quando produ\u00e7\u00e3o, tarifas, cargas ou pol\u00edtica de reserva mudarem, em vez de tratar o resultado original como permanente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Os compradores que definem o \u00e2mbito inicial podem comparar estes requisitos com a <a href=\"https:\/\/hmxenergy.com\/pt\/projetos\/adaptado-para-fabricas-da-malasia-peak-shaving-autoconsumo-conformidade-com-mgc\/\">Projeto de armazenamento em f\u00e1brica na Mal\u00e1sia<\/a>. A p\u00e1gina \u00e9 uma refer\u00eancia de produto ou projeto; a adequa\u00e7\u00e3o final continua a exigir uma especifica\u00e7\u00e3o de projeto por escrito.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Dados de s\u00e9ries temporais brutos e limpos com fuso hor\u00e1rio e intervalo documentados.<\/li><li>Cen\u00e1rios base, de crescimento e de estresse com entradas de perdas, reserva e degrada\u00e7\u00e3o.<\/li><li>Setpoints de controle selecionados e o motivo pelo qual alternativas rejeitadas n\u00e3o foram escolhidas.<\/li><li>Um tra\u00e7o de comissionamento que conecta o modelo ao comportamento medido no site.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Na entrega, forne\u00e7a ao propriet\u00e1rio as entradas do modelo e um gatilho de atualiza\u00e7\u00e3o. Uma mudan\u00e7a material de tarifa, carga, produ\u00e7\u00e3o, clima ou reserva deve levar a uma reexecu\u00e7\u00e3o controlada, em vez de uma promessa sem suporte de que a economia ou o tempo de opera\u00e7\u00e3o originais ainda se aplicam.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"759\" src=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-1024x759.jpg\" alt=\"BESS demand charge management EV charging: Completed 100kW 215kWh C&amp;I solar energy\u2011storage project for Malaysia factory, peak shaving, backup power solution for industrial plant\" class=\"wp-image-3161\" srcset=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-1024x759.jpg 1024w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-300x222.jpg 300w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-768x569.jpg 768w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-1536x1139.jpg 1536w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-2048x1518.jpg 2048w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-16x12.jpg 16w, https:\/\/hmxenergy.com\/wp-content\/uploads\/2026\/09\/Completed-100kW-215kWh-CI-solar-energy\u2011storage-project-for-Malaysia-factory-peak-shaving-backup-power-solution-for-industrial-plant-800x593.jpg 800w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Teste Comercial<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aprovar o investimento somente quando o modelo operacional reproduzir a fatura atual ou a restri\u00e7\u00e3o de servi\u00e7o e ainda funcionar sob um cen\u00e1rio de estresse razo\u00e1vel.<\/p>","protected":false},"excerpt":{"rendered":"<p>Model BESS demand-charge management at EV hubs from billing intervals, charger sessions, grid limits, recharge timing and battery reserve.<\/p>","protected":false},"author":4,"featured_media":1084,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3315","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.2.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"HMX ENERGY\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.2.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"pt_PT\" \/>\n\t\t<meta property=\"og:site_name\" content=\"HMX Energy Co., Ltd -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"EV Charging Demand Charges: Model the Coincident Peak First\" \/>\n\t\t<meta property=\"og:description\" content=\"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t\t<meta property=\"og:image:height\" content=\"495\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-06T10:44:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-04T00:50:20+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Huiming-green-ennergy\/100091938723333\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"EV Charging Demand Charges: Model the Coincident Peak First\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#blogposting\",\"name\":\"EV Charging Demand Charges: Model the Coincident Peak First\",\"headline\":\"EV Charging Demand Charges: Model the Coincident Peak First\",\"author\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/author\\\/hmxenergy\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/120kW-Dual-Gun-Charging-Pile-Project-1.jpg\",\"width\":1000,\"height\":1000},\"datePublished\":\"2026-10-06T10:44:00+00:00\",\"dateModified\":\"2026-10-04T00:50:20+00:00\",\"inLanguage\":\"pt-PT\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#webpage\"},\"articleSection\":\"Blog&amp;News\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog&amp;News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/category\\\/blog\\\/#listItem\",\"position\":2,\"name\":\"Blog&amp;News\",\"item\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/category\\\/blog\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#listItem\",\"name\":\"EV Charging Demand Charges: Model the Coincident Peak First\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#listItem\",\"position\":3,\"name\":\"EV Charging Demand Charges: Model the Coincident Peak First\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog&amp;News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#organization\",\"name\":\"HMX Energy Co., Ltd\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/\",\"telephone\":\"+8613310869219\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/HM-logo.png\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#organizationLogo\",\"width\":740,\"height\":495,\"caption\":\"HM logo\"},\"image\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Huiming-green-ennergy\\\/100091938723333\\\/\",\"https:\\\/\\\/www.instagram.com\\\/hmxenergy?igsh=MWZkY293OG90c3J3MQ&utm_source=qr\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/shenzhen-hmx-new-energy-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/author\\\/hmxenergy\\\/#author\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/author\\\/hmxenergy\\\/\",\"name\":\"HMX ENERGY\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#webpage\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/\",\"name\":\"EV Charging Demand Charges: Model the Coincident Peak First\",\"description\":\"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.\",\"inLanguage\":\"pt-PT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/author\\\/hmxenergy\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/author\\\/hmxenergy\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/120kW-Dual-Gun-Charging-Pile-Project-1.jpg\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#mainImage\",\"width\":1000,\"height\":1000},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/ev-charging-demand-charges-bess\\\/#mainImage\"},\"datePublished\":\"2026-10-06T10:44:00+00:00\",\"dateModified\":\"2026-10-04T00:50:20+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#website\",\"url\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/\",\"name\":\"HMX Energy Co., Ltd\",\"inLanguage\":\"pt-PT\",\"publisher\":{\"@id\":\"https:\\\/\\\/hmxenergy.com\\\/pt\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Taxas de Demanda de Carregamento de VE: Modele Primeiro o Pico Coincidente","description":"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.","canonical_url":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#blogposting","name":"EV Charging Demand Charges: Model the Coincident Peak First","headline":"EV Charging Demand Charges: Model the Coincident Peak First","author":{"@id":"https:\/\/hmxenergy.com\/pt\/author\/hmxenergy\/#author"},"publisher":{"@id":"https:\/\/hmxenergy.com\/pt\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1.jpg","width":1000,"height":1000},"datePublished":"2026-10-06T10:44:00+00:00","dateModified":"2026-10-04T00:50:20+00:00","inLanguage":"pt-PT","mainEntityOfPage":{"@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#webpage"},"isPartOf":{"@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#webpage"},"articleSection":"Blog&amp;News"},{"@type":"BreadcrumbList","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/#listItem","position":1,"name":"Home","item":"https:\/\/hmxenergy.com\/pt\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/category\/blog\/#listItem","name":"Blog&amp;News"}},{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/category\/blog\/#listItem","position":2,"name":"Blog&amp;News","item":"https:\/\/hmxenergy.com\/pt\/category\/blog\/","nextItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#listItem","name":"EV Charging Demand Charges: Model the Coincident Peak First"},"previousItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#listItem","position":3,"name":"EV Charging Demand Charges: Model the Coincident Peak First","previousItem":{"@type":"ListItem","@id":"https:\/\/hmxenergy.com\/pt\/category\/blog\/#listItem","name":"Blog&amp;News"}}]},{"@type":"Organization","@id":"https:\/\/hmxenergy.com\/pt\/#organization","name":"HMX Energy Co., Ltd","url":"https:\/\/hmxenergy.com\/pt\/","telephone":"+8613310869219","logo":{"@type":"ImageObject","url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#organizationLogo","width":740,"height":495,"caption":"HM logo"},"image":{"@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Huiming-green-ennergy\/100091938723333\/","https:\/\/www.instagram.com\/hmxenergy?igsh=MWZkY293OG90c3J3MQ&utm_source=qr","https:\/\/www.linkedin.com\/company\/shenzhen-hmx-new-energy-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/hmxenergy.com\/pt\/author\/hmxenergy\/#author","url":"https:\/\/hmxenergy.com\/pt\/author\/hmxenergy\/","name":"HMX ENERGY"},{"@type":"WebPage","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#webpage","url":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/","name":"EV Charging Demand Charges: Model the Coincident Peak First","description":"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.","inLanguage":"pt-PT","isPartOf":{"@id":"https:\/\/hmxenergy.com\/pt\/#website"},"breadcrumb":{"@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#breadcrumblist"},"author":{"@id":"https:\/\/hmxenergy.com\/pt\/author\/hmxenergy\/#author"},"creator":{"@id":"https:\/\/hmxenergy.com\/pt\/author\/hmxenergy\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/07\/120kW-Dual-Gun-Charging-Pile-Project-1.jpg","@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#mainImage","width":1000,"height":1000},"primaryImageOfPage":{"@id":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/#mainImage"},"datePublished":"2026-10-06T10:44:00+00:00","dateModified":"2026-10-04T00:50:20+00:00"},{"@type":"WebSite","@id":"https:\/\/hmxenergy.com\/pt\/#website","url":"https:\/\/hmxenergy.com\/pt\/","name":"HMX Energy Co., Ltd","inLanguage":"pt-PT","publisher":{"@id":"https:\/\/hmxenergy.com\/pt\/#organization"}}]},"og:locale":"pt_PT","og:site_name":"HMX Energy Co., Ltd -","og:type":"article","og:title":"EV Charging Demand Charges: Model the Coincident Peak First","og:description":"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.","og:url":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/","og:image":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png","og:image:secure_url":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png","og:image:width":740,"og:image:height":495,"article:published_time":"2026-10-06T10:44:00+00:00","article:modified_time":"2026-10-04T00:50:20+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Huiming-green-ennergy\/100091938723333\/","twitter:card":"summary_large_image","twitter:title":"EV Charging Demand Charges: Model the Coincident Peak First","twitter:description":"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.","twitter:image":"https:\/\/hmxenergy.com\/wp-content\/uploads\/2025\/04\/HM-logo.png"},"aioseo_meta_data":{"post_id":"3315","title":"Taxas de Demanda de Carregamento de VE: Modele Primeiro o Pico Coincidente","description":"Model EV charging demand charges using the actual billing interval, coincident sessions, grid cap, battery recharge and tariff ratchet before sizing BESS.","keywords":null,"keyphrases":{"focus":{"keyphrase":"BESS demand charge management EV charging","score":0,"analysis":[]},"additional":[]},"focus_keyword":"BESS demand charge management EV charging","additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":0,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-09-30 03:34:22","updated":"2026-10-06 12:13:10"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hmxenergy.com\/pt\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/hmxenergy.com\/pt\/category\/blog\/\" title=\"Blog&amp;News\">Blog&amp;News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tEV Charging Demand Charges: Model the Coincident Peak First\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/hmxenergy.com\/pt\/"},{"label":"Blog&amp;News","link":"https:\/\/hmxenergy.com\/pt\/category\/blog\/"},{"label":"EV Charging Demand Charges: Model the Coincident Peak First","link":"https:\/\/hmxenergy.com\/pt\/ev-charging-demand-charges-bess\/"}],"_links":{"self":[{"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/posts\/3315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/comments?post=3315"}],"version-history":[{"count":7,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/posts\/3315\/revisions"}],"predecessor-version":[{"id":3485,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/posts\/3315\/revisions\/3485"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/media\/1084"}],"wp:attachment":[{"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/media?parent=3315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/categories?post=3315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hmxenergy.com\/pt\/wp-json\/wp\/v2\/tags?post=3315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}