储能一体化充电桩

HMX introduces the 100/200 KWH BESS Integrated Charging Solution—a compact all-in-one unit that combines battery storage, DC fast charging, and smart energy management. Ideal for locations with limited or no grid access, it provides reliable, flexible EV charging in logistics hubs, scenic areas, highway stops, and construction sites.

  • Rated Energy:100/200KWH
  • 最大输出功率:180千瓦
  • Battery pack:2P/4P48S (2/4 pcs Module)
  • 启动方式:WiFi / 蓝牙 / APP
  • Charging Guns:2 Guns (CCS1 / CCS2 / GBT optional)
  • Equipped with touch screen
  • Warranty:24 Months
All-in-one BESS charging unit

All‑in‑one BESS charging unit integrating battery storage, DC fast charging and smart energy management

Core Features & Benefits

Off-Grid Ready Solution

Operate independently without heavy grid transformation, perfect for remote sites lacking stable power supply.

180kW Max Dual-Gun DC Charging

Dual charging guns compatible with CCS1, CCS2, GBT, charge two EVs simultaneously.

Liquid-Cooled Battery Pack

Modular 2P/4P-48S battery design with liquid thermal management for stable temperature control and long service life.

Flexible Operation Modes

Control via WiFi, Bluetooth, mobile APP, plus local touch-screen for on-site manual operation.

Multi-Layer Safety Protection

Battery pack IP67, whole machine IP54. Built-in over-voltage, over-current, short-circuit and over-temperature protection.

LED Status Indicator

Clear status feedback: Green for charging, Blue for gun idle, Red for system fault.

System Working Overview

Solar power to energy storage to EV fast charging

Typical Application Scenarios

Logistics Hubs

Logistics Hubs

Self-contained charging for delivery fleets without large-scale grid upgrade.

Scenic Areas

Scenic Areas

EV charging service for tourist sites with weak grid infrastructure.

Highway Stops

Highway Stops

Supplement high-speed charging capacity and reduce grid investment cost.

Construction Sites

Construction Sites

Temporary flexible charging for engineering vehicle fleets.

Product Real Shots

EV charging equipment showroom
BESS charging units on the factory line
BESS unit assembly in the workshop
BESS units in the factory

技术规格

项目参数
额定能量100kWh / 200kWh (200kWh version:193kWh,4P48S module)
Max Output Power180kW
Battery Thermal ManagementLiquid Cooling
Charging InterfaceDual‑gun, CCS1 / CCS2 / GBT optional
Control ModeWiFi / Bluetooth / APP / Local Touch Screen
Battery Pack ProtectionIP67
Whole Unit ProtectionIP54
3‑Phase AC Input380VAC
输出电压范围200‑1000VDC
Dimension(200kWh)2600×1350×1600毫米
Weight(200kWh)2800千克
保修24 Months

Frequently Asked Questions

Yes. It can run purely on battery energy. Solar panels are recommended for long-term self-sufficiency. AC grid can be used as backup recharge source.

Dual-gun design supports CCS1, CCS2 and GBT, enabling two-vehicle simultaneous charging.

Difference lies in battery module quantity. 100kWh uses 2 modules, 200kWh uses 4 modules. Both versions share max 180kW output power.

Green: In charging; Blue: Charging gun idle; Red: System fault alarm.

Request Your Wholesale Quotation

Tell us your order quantity, target market and custom requirements, we will reply with competitive offer shortly.

获取报价

立即联系我们,获取您的定制太阳能及储能解决方案。.